Preliminary works by customer

  • Electrical mains supply and cable laying
  • Water supply
  • Process water inlet temperature max. +25°C
  • Floor drain in installation room
  • Ventilation of installation room
  • Exhaust air pipe for hydrogen discharge to be placed in a continuously rising way to the outside (min. PN 6)
  • Ventilation port min. 500cm²
  • Permissible room temperatures min. +10 °C to max. + 40 °C

 

Installation of a backflow preventer, air inlet valve or pipe separator required, if demanded by the local utility companies. A separate technical room is not required.