Preliminary works by customer

  • Cable laying
  • Electrical mains connection
  • Water supply
  • Sewer connection
  • Installation place
  • Proper ventilation of installation room
  • Heat load to be observed; if necessary cooling measures are to be taken to ensure the room temperate is permanently below the maximum
  • Free drain (without counter pressure) of NaOCl and unsaturated brine into the respective tanks must be ensured.
  • Exhaust air pipe for hydrogen to be laid to enhance flow (e.g. pipe elbows - no angles); must be routed to the outside