Preliminary works by customer
- Cable laying
- Electrical mains connection
- Water supply
- Sewer connection
- Installation place
- Proper ventilation of installation room
- Heat load to be observed; if necessary cooling measures are to be taken to ensure the room temperate is permanently below the maximum
- Free drain (without counter pressure) of NaOCl and unsaturated brine into the respective tanks must be ensured.
- Exhaust air pipe for hydrogen to be laid to enhance flow (e.g. pipe elbows - no angles); must be routed to the outside